Suddenly Busy Part 3
Well, in order to make this post about the last two weeks seem somewhat shorter and less dry to the casual reader (since anyone not directly involved in them may care a lot less than I do), I am going to put the highlights in bullet form.
After returning from our weekend in Sylvan Lake on Tuesday, Aug. 2, we knew we had our work cut out for us. The first stop for me was the paint store. For Jason, it was the hardware store--his trips there became almost daily. I'm sure he now knows all the employees by first name. Fortunately, he was just beginning his scheduled holidays, so had plenty of time with helping to get our new house ready! His main accomplishments that week were getting the trailer levelled with the help of our friend Brian, getting the pressure pump moved over from the other trailer and getting that and the septic hooked up, and getting the electrician here by Friday so we could bathe again. Yay!
By Saturday morning, we were cheering because Jude came back into the holiday trailer from his bathroom break to report that there was hot water. The celebration was short-lived, however. After only three quick showers, Jabin's bath-water came out cold. I waited four hours before trying to have my shower, and within five minutes the water was cold. Hmmph. Guess we'll need to change out the water heater.
We are now referring to our three homes as the "new trailer", the "holiday trailer" or "camper", and the "old trailer", or, more affectionately, the "parts trailer".
The first part to come in from the "parts trailer" was our other water heater. Jason changed it out by himself on Sunday, which was quite the job. I continued painting.
Upon removing the first baseboard from the dining room to start painting, I discovered (horrors!) mould behind it. And the same behind the second board, which came from the peninsula adjoining it. Further inspection (by removing the peninsula and lifting up the wall panel) revealed the bottom part of the wall frame to be damp, but there to be no rot or damage in the wall or behind the poly. We concluded it was from a leak from either the dishwasher or the sink, but since we had no running water at the time, had to wait a week to confirm it. In the meantime, we let the wall dry out and discovered we liked the kitchen better without the peninsula in it. Bonus!
Turns out it was a leak from the faucet, which is a really old unilever-style. When you lift it to the hot side, water pours out around the base. Changing out the kitchen faucet from the "parts trailer" is pretty high on Jason's "to-do" list right now (but really low on his "things-I-enjoy-doing" list! We had just put the other one in last winter, and it is much nicer, anyway--although, a real pain-in-the-you-know-what to deal with, apparently.)
Painting jobs completed: Living room; kitchen; Jude's room; alcove in our bedroom. Still to do: hallway; bathroom; dining room; kitchen cabinets.
While revamping the peninsula design, Jason built me a "weathered-wood"-look set of display shelves at the end of my cupboards from some old pallets. He does not really enjoy carpentry work, and I am so proud of him. He did a great job, and I absolutely love them! (I can't post photos right now, due to computer issues. I will be posting the "grand photo tour" once we are done renovating, anyway.)
We spent our first night in our new home on Wednesday, which happened to be my 34th birthday. My friend Laurie C. commented on my Facebook update about this, "Lucky girl! Not everybody gets a new house for her birthday!" She's right! :-D
Jabin's sock (see yesterday's post) has been successfully frogged and is well on it's way to complete recovery. I finally got over my grumpiness about my mistake. I'm not sure if that could be called an "adventure in knitting", but hopefully the "inconvenience" did teach me to inspect my heels carefully before moving past them from now on!
And that's about it!... so far.